Discuz! Board

 找回密码
 立即注册
搜索
热搜: 活动 交友 discuz
查看: 62|回复: 0

GE Lightspeed16 球馆安装

[复制链接]

1万

主题

1万

帖子

5万

积分

管理员

Rank: 9Rank: 9Rank: 9

积分
58026
发表于 2020-10-19 09:27:55 | 显示全部楼层 |阅读模式

                    

                    

                    
                    
                    <p><strong><span></span></strong></p><p><p><img src="image/20201019/1bd08b695d5fd805cb63ee05a2610294_1.jpg" /></p></p><p><strong><span></span></strong><br  /></p><p><strong><span>&nbsp; GE Lightspeed16 <span>球馆安装</span></span></strong></p><p><span>一.</span><strong><span>故障现象:</span></strong><span>小焦点坏,灯丝断。</span></p><p><br  /></p><p><span><p><img src="image/20201019/bb87ee785085c9e8aa094722db7d5e24_2.jpg" /></p></span></p><p><span>二.</span><strong><span>维修过程:</span></strong><span><span>更换</span>6.3<span>球馆,具体过程如下:</span></span></p><p><span>&nbsp;&nbsp;&nbsp;&nbsp;</span><span><span>&nbsp;</span><span>1.安装前准备工作,需要工具,扭力扳手,套筒,14的扳手,葫芦(百分表),及其他常用工具。</span></span></p><p><span>2<span>拆开两个侧盖</span>,取下上面的两个盖板.(注意右侧有个压合维修开关记的要压)</span></p><p><span>3. 将侧面的120V和HV and axial drive<span>后面的两个开关分别打至</span>OFF位</span></p><p><span>4.<span>拆掉前盖</span>,注意Gantry和前盖的连线</span></p><p><span>5. 将SYS打至OFF位,Service打至ON,手动旋转球管到90度的位置,栓上固定销子</span></p><p><span>6. 检查开关全部打至OFF位,然后关机,最后关掉稳压器</span></p><p><span>7.&nbsp;<span>松开管球上的插头和电缆头,用塑料纸将电缆头包好并固定好</span></span></p><p><span>8.<span>松开</span>Gantry右上方的轨道螺丝,拉出轨道并安装上吊葫芦</span></p><p><span>9.<span>用吊葫芦挂住管球并使其链子绷紧</span>,检查所有的干扰物已经处理好并且确认.</span></p><p><span>10.按要求拆下球管,注意卸螺丝事项:一般的话先把最下面的两颗先松了,再松上面的.</span></p><p><span>11.按要求装上球管,把球管转到0度位置调整螺丝的松紧情况,开始的时候一般不要上的很紧,以便方便后面的调整.</span></p><p><span>12.把百分表装到指定的位置<span>,检查一切准备工作已经做好</span></span></p><p><span>14.清灯丝<span>,填写球馆信息</span></span></p><p><span>Filament data。<span>Diagnostics-------generator test -------clear filament &nbsp;&nbsp;</span>Aging / tube stats. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;特殊软件版本在<span>generator tools</span></span></p><p><span>15.做机架balance</span></p><p><br  /></p><p><span><strong><span>16.</span></strong><span><span>开始做</span>BOW .ISO(<span>在做此步骤时</span><span>,</span><span>可能会提示温度过高</span><span>,</span><span>这个时候不要慌</span><span>,</span><span>一般等上</span><span>40</span><span>分钟后温度降至</span><span>:400</span><span>度以下就可以做了</span><span>)(</span><span>一般情况下就是最开始就做</span><span>BOW ,ISO</span><span>两个就不会提示温度过高了</span></span></span></p><p><span>17.输入球馆当前位置0degree,点<span>ok</span>,如下图<span>a b c</span>,然后<span>dismiss</span>,点击第二<span>scan</span>,最后计算</span></p><p><span>&nbsp; 18.做完bow ,开始做<span>iso</span>,先扫空气,然后用机头支架插个内六打点,用激光定位灯的内线打点距离<span>2cm</span>,调位置时,<span>up</span>逆时针,<span>down</span>顺时针,每次调的时候</span></p><p><span><span>19.都要把螺丝稍微柠孙,然后再调,在拧紧。百分表(未尝试过),调试过程要有耐心。一直到提示</span>iso pass</span></p><p><span>20.做全校准,为了防止有为影,80 100 120 140,都得做,做小模时不可以扫到铁。顺序是 先空气,中大小,每个过程必须在<span>10</span>分钟内调试完,否则就得重新来。调试过程床高度通常在<span>142-145</span>之间,这样剩下的就是微调机头支架。</span></p><p><span>21.中模校准</span><span>&nbsp;</span></p><p><span>&nbsp; 22.CT<span>值校准</span></span></p><p><strong><span><span>到此处</span> <span>球馆安装结束</span></span></strong></p><p><br  /></p>
               
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|手机版|小黑屋|Comsenz Inc. ( 浙ICP备17000336号-1 )

GMT+8, 2025-3-11 02:43 , Processed in 0.081423 second(s), 33 queries .

Powered by Discuz! X3.4

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表